Stationary Battery Installations
The installation of a UPS, battery or common power system element is vital in the satisfactory operation of any back up power system. Using vast experience and specialists in each area provides the user with the confidence that "its installed properly." Proper installation methods lead to longer life expectancy for equipment and provides proper operation of connected critical equipment.
When installations are performed, a pre-approved Method Of Procedure (MOP) is developed and provided for customer acceptance. Installation services begin prior to equipment on site. Pre-test of batteries or common electrical components is performed at our facility, prior to equipment being transported to a customer site for installation.
Any electrical installations such as those for UPS, Switchgear or other power related device is performed by certified, electrical contractors or electricians that are licensed and trained.
Battery installations are performed following industry standards for battery systems using IEEE-485, IEEE-1187 and IEEE-1106. These standards provide the user with a common approach that has been developed by users, manufacturers and service providers across the industry. All IEEE standards that are used in ATS installations supersede the specific installation requirements of each manufacturer.
The experience in the area of battery installations is of the elitist in the industry. Following the latest standards and OEM manuals, ATS provides proven installation techniques. Always following safe work practices, ATS technicians have provided services to some of the most recognizable, critical facilities in the country. Battery installations performed include vented lead acid (wet cell batteries), valve regulated lead acid batteries (sealed), Gel style batteries, nickel cadmium products, renewable energy products.